The Glenairlie Pump Station is one of the Town’s oldest refurbished pump stations. The pump station is due for upgrades to maintain smooth, uninterrupted operations of sewer conveyance for residents and to reduce unforeseen repair costs that result from aging infrastructure.

The project includes replacements to the electrical kiosk and valve chamber. A second pump will also be installed in accordance with best practices to improve system redundancy.

Construction is expected in fall 2025 and completion estimated to be winter/spring 2026.

A map showing the location of the pump station